FAP 29 over RICHLAND CREEK OVERFLOW

IN DAYTON CITY LIMITS · County 143, Tennessee · Built 2007 · 2 Lanes · 23,414 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
72SR0290005
Year Built
2007
Length
44.9 m (147.3 ft)
Max Span
44.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
23,414
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.