FAP 33 over BRANCH

.5 MI S OF JCT SR 30 · County 139, Tennessee · Built 2013 · 4 Lanes · 7,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
70SR0330031
Year Built
2013
Length
9.4 m (30.8 ft)
Max Span
2.1 m
Width
1.8 m (5.9 ft)
Lanes
4
Daily Traffic
7,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$292,000
Total Project Cost
$439,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.