FAP 13 over BUFFALO RIVER

2.4 MI N. OF LOBELVILLE · County 135, Tennessee · Built 2022 · 2 Lanes · 2,670 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
68SR0130017
Year Built
2022
Length
335.3 m (1100.1 ft)
Max Span
45.1 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
2,670
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,870,000
Total Project Cost
$11,806,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.