FAP 52 over WEST FORK OBEY RIVER

2.9 MI W OF PICKETT CO · County 133, Tennessee · Built 1941 · 2 Lanes · 894 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
67SR0520003
Year Built
1941
Length
74.1 m (243.1 ft)
Max Span
13.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
894
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$371,000
Total Project Cost
$557,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.