NFA A279 over DEER CREEK

4.7 MI E JCT SR3&SR21 · County 131, Tennessee · Built 1970 · 2 Lanes · 170 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
660A2790001
Year Built
1970
Reconstructed
2010
Length
20.6 m (67.6 ft)
Max Span
8.7 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
170
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$98,000
Total Project Cost
$148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.