NFA A141 over BRANCH
1.3 MI NW JCT SR3&SR21 · County 131, Tennessee · Built 1970 · 2 Lanes · 180 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
36.465636, -89.051583
This bridge is in worse condition than 86.6% of bridges in County 131. The average bridge in Tennessee is 0 years old; this one is 56 years old.
Nearby Bridges
I 69 over ICG RR AND FRONTAGE RD
Built 2013
I 69 over ICG RR AND FRONTAGE RD
Built 2013
I 69 over BRANCH
Built 2012
SR021 over FUTURE I-69
Built 2020
FAS 21 over PURSLEY CREEK
Built 2008
PERRY BROWDER RD over I-69
Built 2013
FAP 3 299506S over IC RAILROAD
Built 1970
FAP 3 299506S over IC RAILROAD
Built 1970
NFA A834 over BRANCH
Built 2003
MT ZION RD over I-69
Built 2013
Bridge Details
- Structure #
- 660A1410001
- Year Built
- 1970
- Reconstructed
- 2011
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $144,000
- Total Project Cost
- $217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.