FAP 55 over BOBO CREEK

4.1 MI NE OF LYNCHBURG · County 127, Tennessee · Built 1953 · 2 Lanes · 5,289 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
64SR0550013
Year Built
1953
Length
14.8 m (48.6 ft)
Max Span
7.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
5,289
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$617,000
Total Project Cost
$926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.