NFA 971 (SA 6313) over BRANCH

6 MI N CUNNINGHAM · County 125, Tennessee · Built 1963 · 2 Lanes · 2,364 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
63S63630005
Year Built
1963
Length
44.5 m (146 ft)
Max Span
14.6 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
2,364
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$874,000
Total Project Cost
$1,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.