FAP 99 over BAPTIST CREEK

2.89 MI.E. LEWIS CO. LINE · County 119, Tennessee · Built 1948 · 2 Lanes · 3,801 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
60SR0990003
Year Built
1948
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,801
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$899,000
Total Project Cost
$1,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.