FAP 6 over BRANCH

3 M. W. OF COLUMBIA · County 119, Tennessee · Built 1988 · 2 Lanes · 15,807 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
60SR0060045
Year Built
1988
Length
20.7 m (67.9 ft)
Max Span
4.6 m
Lanes
2
Daily Traffic
15,807
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$579,000
Total Project Cost
$869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.