RAMP TO SR-396 over I-65

I-65 EXIT 53 · County 119, Tennessee · Built 1987 · 1 Lanes · 44,685 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
60I00650040
Year Built
1987
Length
86 m (282.2 ft)
Max Span
43 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
44,685
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,535,000
Total Project Cost
$2,303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.