FAP 50 over BRANCH

IN COLUMBIA · County 119, Tennessee · Built 1978 · 2 Lanes · 28,997 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
60FA0380003
Year Built
1978
Length
7.8 m (25.6 ft)
Max Span
2.4 m
Width
34.3 m (112.5 ft)
Lanes
2
Daily Traffic
28,997
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.