FAP 50 over BRANCH

.5 M SE JCT SR271&SR50 · County 117, Tennessee · Built 1935 · 2 Lanes · 3,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
59SR0500007
Year Built
1935
Length
9.7 m (31.8 ft)
Max Span
3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$205,000
Total Project Cost
$308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.