FAP 11 over DUCK RIVER

.5 S JCT SR99&SR11 · County 117, Tennessee · Built 1965 · 2 Lanes · 6,883 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
59SR0110029
Year Built
1965
Length
132.9 m (436 ft)
Max Span
36.9 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
6,883
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,487,000
Total Project Cost
$5,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.