SR 150 over PIPELINE

0.6 MI W JCT SR28 · County 115, Tennessee · Built 2018 · 2 Lanes · 3,306 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
58SR1500001
Year Built
2018
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
3,306
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.