FAP 28 over GRIFFITH CREEK

2.8 MI.NORTH OF WHITWELL · County 115, Tennessee · Built 1972 · 2 Lanes · 5,947 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
58SR0280009
Year Built
1972
Length
25.9 m (85 ft)
Max Span
9.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
5,947
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$558,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.