FAP 27 over SUCK CREEK

MARION-HAMILTON CO. LINE · County 115, Tennessee · Built 1983 · 2 Lanes · 4,514 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
58SR0270017
Year Built
1983
Length
72.9 m (239.2 ft)
Max Span
24.6 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,514
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,838,000
Total Project Cost
$2,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.