FAP 151 over SALT LICK CREEK

IN RED BOILING SPRINGS · County 111, Tennessee · Built 2017 · 2 Lanes · 313 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
56SR1510005
Year Built
2017
Length
13.7 m (44.9 ft)
Max Span
4.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
313
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$531,000
Total Project Cost
$797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.