I75 NBL over MOUSE CREEK

2.6 MI.FROM BRADLEY CO. · County 107, Tennessee · Built 1971 · 2 Lanes · 47,306 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54I00750003
Year Built
1971
Length
71.3 m (233.9 ft)
Max Span
23.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
47,306
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.