SR 73 over TENNESSEE RIVER

4.8 MI SOUTH OF I-75 · County 105, Tennessee · Built 2017 · 4 Lanes · 13,140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
53SR0730021
Year Built
2017
Length
426.7 m (1399.9 ft)
Max Span
152.4 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
13,140
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.