FAP 15 over BRANCH

2 M E FROM SR10 · County 103, Tennessee · Built 2008 · 5 Lanes · 12,671 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
52SR0150037
Year Built
2008
Length
8.5 m (27.9 ft)
Max Span
3.7 m
Lanes
5
Daily Traffic
12,671
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$348,000
Total Project Cost
$523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.