FAP 115 over SR115 /SR158&TENN. RIV.

IN KNOXVILLE · County 093, Tennessee · Built 1990 · 8 Lanes · 62,553 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
47SR1150009
Year Built
1990
Length
359.5 m (1179.5 ft)
Max Span
98.5 m
Width
41.5 m (136.2 ft)
Lanes
8
Daily Traffic
62,553
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$38,750,000
Total Project Cost
$58,126,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.