FAU 62 347643G over SOU RWY SECOND CR & E571

1.4 M W OF I75 · County 093, Tennessee · Built 1994 · 6 Lanes · 11,735 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
47SR0620015
Year Built
1994
Length
114.6 m (376 ft)
Max Span
47.2 m
Width
27.1 m (88.9 ft)
Lanes
6
Daily Traffic
11,735
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$874,000
Total Project Cost
$1,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.