FAU 1 730613T over SOUTHERN RAILWAY

1.3 M N OF SR33 · County 093, Tennessee · Built 2022 · 4 Lanes · 28,673 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
47SR0010025
Year Built
2022
Length
208.5 m (684.1 ft)
Max Span
55.9 m
Width
18.5 m (60.7 ft)
Lanes
4
Daily Traffic
28,673
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,559,000
Total Project Cost
$14,339,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.