FAU 1124 (SA 4729) over HOLSTON R./R. SHORES DR.

STRAWBERRY PLNS PK · County 093, Tennessee · Built 1949 · 2 Lanes · 4,259 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
47S24080001
Year Built
1949
Length
260.6 m (855 ft)
Max Span
61 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
4,259
Material
Steel Continuous
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$7,600,000
Total Project Cost
$11,401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.