I40 over I40 / WESLEY RD.

.2 M N OF DORCHESTER DR · County 093, Tennessee · Built 1962 · 6 Lanes · 179,856 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
47I00400025
Year Built
1962
Reconstructed
2002
Length
35.2 m (115.5 ft)
Max Span
12 m
Width
33.7 m (110.6 ft)
Lanes
6
Daily Traffic
179,856
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,655,000
Total Project Cost
$2,483,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.