I40 over CAMPBELL STATION RD

IN FARRAGUT · County 093, Tennessee · Built 1968 · 6 Lanes · 79,585 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
47I00400005
Year Built
1968
Reconstructed
1985
Length
43.3 m (142.1 ft)
Max Span
18.3 m
Width
39.8 m (130.6 ft)
Lanes
6
Daily Traffic
79,585
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.