NFA D718 over TUCKAHOE CREEK

SMITH SCH RD-AT MIDWAY · County 093, Tennessee · Built 1940 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
470D7180001
Year Built
1940
Length
13.4 m (44 ft)
Max Span
12.2 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$91,000
Total Project Cost
$137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.