FAP 67 over DOE CREEK

1.2 M N OF PIERCE RD · County 091, Tennessee · Built 1931 · 2 Lanes · 3,667 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

36.4227, -81.943603

This bridge is in worse condition than 76.1% of bridges in County 091. The average bridge in Tennessee is 0 years old; this one is 95 years old.

Nearby Bridges

Bridge Details

Structure #
46SR0670009
Year Built
1931
Reconstructed
1957
Length
27.9 m (91.5 ft)
Max Span
14.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
3,667
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$978,000
Total Project Cost
$1,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.