FAP 151 over HUDSON CREEK

5 MI EAST OF SR 56 · County 087, Tennessee · Built 1984 · 2 Lanes · 464 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
44SR1510001
Year Built
1984
Length
20.9 m (68.6 ft)
Max Span
4.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
464
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.