FAP 53 over ROARING RIVER

3 MI. N. OF GAINSBORO · County 087, Tennessee · Built 1972 · 2 Lanes · 3,137 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
44SR0530015
Year Built
1972
Length
213.4 m (700.1 ft)
Max Span
71.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
3,137
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,554,000
Total Project Cost
$14,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.