FAP 13 over DUCK RIVER

4 MILES NE.OF BUFFALO · County 085, Tennessee · Built 2005 · 2 Lanes · 2,230 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
43SR0130013
Year Built
2005
Length
607.6 m (1993.4 ft)
Max Span
41.3 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
2,230
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,153,000
Total Project Cost
$1,730,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.