FAP 50 over DUCK RIVER

.7 MI.SE.OF SHADY GROVE · County 081, Tennessee · Built 1951 · 2 Lanes · 2,848 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
41SR0500031
Year Built
1951
Reconstructed
1976
Length
267.9 m (878.9 ft)
Max Span
36.6 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
2,848
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,079,000
Total Project Cost
$9,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.