NFA A003 over PINEY RIVER

5 M. N. NUNNELLY · County 081, Tennessee · Built 1970 · 2 Lanes · 230 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
410A0030001
Year Built
1970
Length
68 m (223.1 ft)
Max Span
14 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
230
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$950,000
Total Project Cost
$1,426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.