FAS 218 over OVERFLOW

3 MI E OF PARIS · County 079, Tennessee · Built 1988 · 2 Lanes · 4,855 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
40SR2180003
Year Built
1988
Length
105.5 m (346.1 ft)
Max Span
21.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,855
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.