NFA A065 over NORTH FORK OBION RIVER

9 MI. W. OF SR54 · County 079, Tennessee · Built 2004 · 2 Lanes · 20 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
400A0650001
Year Built
2004
Length
18.5 m (60.7 ft)
Max Span
5.9 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
20
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.