NFA 5566 (SA 3911) over M. FK. FORKED DEER RIVER

1.2 MI N OF SR20 · County 077, Tennessee · Built 1973 · 2 Lanes · 560 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
39S80390001
Year Built
1973
Length
8.7 m (28.5 ft)
Max Span
8.7 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
560
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$87,000
Total Project Cost
$131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.