FAP 1 over HORD CREEK

1.2 M SE OF CHURCH HILL · County 073, Tennessee · Built 1968 · 4 Lanes · 15,422 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
37SR0010027
Year Built
1968
Length
9.9 m (32.5 ft)
Max Span
3 m
Width
156.1 m (512.1 ft)
Lanes
4
Daily Traffic
15,422
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$683,000
Total Project Cost
$1,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.