FAP 1 over STONEY POINT CREEK

1MI. N. OF SURGOINSVILLE · County 073, Tennessee · Built 1976 · 6 Lanes · 10,287 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
37SR0010019
Year Built
1976
Length
6.8 m (22.3 ft)
Max Span
3 m
Width
78.9 m (258.9 ft)
Lanes
6
Daily Traffic
10,287
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$291,000
Total Project Cost
$437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.