FAS 347 over HOLSTON RIVER

.97 M E OF TUNNEL HILL RD · County 073, Tennessee · Built 1972 · 2 Lanes · 1,147 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
37S23670003
Year Built
1972
Length
476.1 m (1562 ft)
Max Span
45.9 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,147
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,478,000
Total Project Cost
$3,718,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.