FAS 346 730147P over SOUTHERN RAILWAY

NEAR MOUNT CARMEL · County 073, Tennessee · Built 1980 · 2 Lanes · 3,153 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37005680003
Year Built
1980
Length
62.1 m (203.7 ft)
Max Span
21.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
3,153
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.