FAP 128 over HATLEY CREEK

AT PICKWICK LANDING · County 071, Tennessee · Built 1947 · 2 Lanes · 5,683 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
36SR1280003
Year Built
1947
Length
26.1 m (85.6 ft)
Max Span
8.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
5,683
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$269,000
Total Project Cost
$404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.