FAP 125 over CRYSTAL SPRING BRANCH

IN MIDDLETON · County 069, Tennessee · Built 1948 · 2 Lanes · 4,763 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
35SR1250005
Year Built
1948
Reconstructed
1966
Length
7 m (23 ft)
Max Span
3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
4,763
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$154,000
Total Project Cost
$232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.