NFA 865 (SA 3504) over SPRING CREEK
1 MI S OF BOLIVAR · County 069, Tennessee · Built 1964 · 2 Lanes · 1,768 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.214169, -89.000061
This bridge is in worse condition than 83% of bridges in County 069. The average bridge in Tennessee is 0 years old; this one is 62 years old.
Nearby Bridges
NFA A192 over DRY BRANCH
Built 1992
FAP 125 over BRANCH
Built 1949
FAP 125 over SPRING CREEK
Built 1949
FAP 125 over BRANCH
Built 1966
FAP 125 over DRY BRANCH
Built 2004
NFA A191 over BRANCH
Built 2020
FAP 15 over OVERFLOW
Built 1930
FAP 15 over SPRING CREEK
Built 1930
FAP 125 over CARTER BRANCH
Built 2004
FAP 15 over DRAINAGE DITCH
Built 1986
Bridge Details
- Structure #
- 35S82320001
- Year Built
- 1964
- Length
- 200.6 m (658.1 ft)
- Max Span
- 15.8 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,768
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,358,000
- Total Project Cost
- $6,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.