FAP 29 over SR-29 RAMP / POE BRANCH

HARRISON LN EXIT RAMP · County 065, Tennessee · Built 1999 · 1 Lanes · 35,457 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
33SR0290105
Year Built
1999
Length
24.8 m (81.4 ft)
Max Span
8.3 m
Width
15.1 m (49.5 ft)
Lanes
1
Daily Traffic
35,457
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.