FAP 29 over SODDY CREEK

0.73 MI. N OF SR-319 JCT. · County 065, Tennessee · Built 1984 · 4 Lanes · 27,648 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
33SR0290073
Year Built
1984
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
27,648
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,749,000
Total Project Cost
$2,624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.