FAU 8 over TN RIVER & FAU 5395
MARKET STREET BRIDGE · County 065, Tennessee · Built 1917 · 4 Lanes · 26,697 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.056636, -85.309575
This bridge is in worse condition than 95.3% of bridges in County 065. The average bridge in Tennessee is 0 years old; this one is 109 years old.
Nearby Bridges
FAU 5395 over PEDESTRIAN WALKWAY
Built 2004
FAU 5395 over RAVINE-WALNUT ST.BRIDGE
Built 1971
FAU A342 over RIVERFRONT PKWY. & RAMP
Built 1971
FAP 29 over TN R/SOURR/FAU 5395&3619
Built 1955
I124 NBL over W. 4TH ST (SR 389)
Built 2020
RAMP TO I124 NBL over W. 4TH ST (SR 389)
Built 2020
FAU 3546 over TN RIVER & A231 & A267
Built 1984
FAU 5395 over GEORGIA AVE.
Built 1972
I124 SBL over W. 4TH ST (SR 389)
Built 2020
FAU 3549 over FAU 3546(GEORGIA AVE)
Built 1971
Bridge Details
- Structure #
- 33SR0080007
- Year Built
- 1917
- Reconstructed
- 2007
- Length
- 609.6 m (2000 ft)
- Max Span
- 109.4 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 4
- Daily Traffic
- 26,697
- Material
- Steel
- Design
- Movable - Bascule
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $39,843,000
- Total Project Cost
- $59,765,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.