FAU 3595 over MOUNTAIN CREEK

IN RED BANK · County 065, Tennessee · Built 1992 · 2 Lanes · 13,563 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
33M35950001
Year Built
1992
Length
14 m (45.9 ft)
Max Span
4.3 m
Width
35.7 m (117.1 ft)
Lanes
2
Daily Traffic
13,563
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.