I124 SBL over W. 9TH ST. (FAU 3551)

3 MI S OF TN RIVER · County 065, Tennessee · Built 2020 · 1 Lanes · 64,726 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33I01240014
Year Built
2020
Length
42.2 m (138.5 ft)
Max Span
40.6 m
Width
22.8 m (74.8 ft)
Lanes
1
Daily Traffic
64,726
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.