I24 over HICKORY ST (4981)
.2 MI FROM SR27 · County 065, Tennessee · Built 1961 · 7 Lanes · 104,175 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.018475, -85.287797
This bridge is in worse condition than 56.3% of bridges in County 065. The average bridge in Tennessee is 0 years old; this one is 65 years old.
Nearby Bridges
I24 over SR 27 (ROSSVILLE BLVD.)
Built 1961
I24 over 4TH AVE. (3572)
Built 1961
FAU 3573 over SMALL BRANCH
Built 1970
I24 over CANNON AVE (NFA B631)
Built 1962
NFA B631 over BRANCH
Built 1962
I24 over SOU RWY (ABANDONED)
Built 1963
I124 NBL over SOUTHERN RWY
Built 2018
I24/I24 RP over I24/I24RP TO CENTRAL AVE
Built 1960
I24 over DODDS AVE (FAU 3557)
Built 1963
I24 over SR 8 (US41) WESTSIDE DR.
Built 1963
Bridge Details
- Structure #
- 33I00240037
- Year Built
- 1961
- Reconstructed
- 1987
- Length
- 40.8 m (133.9 ft)
- Max Span
- 19.5 m
- Width
- 38.4 m (126 ft)
- Lanes
- 7
- Daily Traffic
- 104,175
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,287,000
- Total Project Cost
- $3,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.